The planned opening of the Karl Marx Head in Chemnitz has been delayed. According to the city, this is because work on the scaffolding had to be halted. It was discovered that necessary documentation regarding the scaffolding’s structural integrity is missing. As soon as this documentation is available, work on the scaffolding can resume. According to the information provided, it is not yet clear when the Chemnitz landmark—popularly known as “Nischel”—will be able to open. After 55 years, the Karl Marx Head is in need of renovation. However, it is unclear what condition the interior of the world’s second-largest portrait bust is in. That is why an expert plans to climb inside the bust to assess the situation. The actual restoration is scheduled to begin in the summer of 2027 and is expected to last into 2028. The bust also includes a relief in the background bearing the inscription “Workers of the world, unite!” in several languages. This part of the ensemble has already been restored. The monumental monument was unveiled in October 1971. It was created by the Russian sculptor Lev Kerbel (1917–2003). The 40-metric-ton bust was originally cast in a foundry in what was then Leningrad—now St. Petersburg—and then dismantled into 95 pieces for transport. Copyright 2026, dpa (www.dpa.de). All rights reserved