The subsoil for the new bridges over the Elbe and the railroad tracks in Bad Schandau will be examined again in the coming weeks. From Monday, there will therefore be brief interruptions to train services in order to bring an excavator to its work sites in the area of the tracks, according to the State Office for Road Construction and Transport.
Drilling will be carried out on the B172 from Königstein from April 20. A temporary full closure has been announced for this, but the exact time has not yet been determined. The final drilling on the other side of the Elbe will follow from 18 May, for which a half-sided traffic route will be set up on the B172.