loading

Nachrichten werden geladen...

New bridge on the B180 is opened

Construction work completed: New B180 bridge over Dresden-Hof railroad line open to traffic from Wednesday (symbolic photo).  / Photo: Jan Woitas/dpa
Construction work completed: New B180 bridge over Dresden-Hof railroad line open to traffic from Wednesday (symbolic photo). / Photo: Jan Woitas/dpa

More than 200,000 fans flock to the Sachsenring every year for the MotoGP. Now the bridge construction work on an important access road is coming to an end.

After ten months of construction, the new bridge on the B 180 federal highway in Hohenstein-Ernstthal (Zwickau district) has been opened. From Wednesday (May 28), motorists will be able to drive over the structure, as announced by the State Office for Road Construction and Transport.

The bridge over the Dresden-Hof railroad line was reportedly no longer safe for traffic due to considerable damage. It was therefore replaced by a modern prestressed concrete bridge. The costs were quoted at 2.8 million euros.

The bridge is also an important access road for the MotoGP, which attracts more than 200,000 visitors to the Sachsenring every year. This year, the race will take place in mid-July.

Copyright 2025, dpa (www.dpa.de). All rights reserved

🤖 Die Übersetzungen werden mithilfe von KI automatisiert. Wir freuen uns über Ihr Feedback und Ihre Hilfe bei der Verbesserung unseres mehrsprachigen Dienstes. Schreiben Sie uns an: language@diesachsen.com. 🤖